Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 26934 REL 36: 1999-003-01 EXP PNNL CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Project Number:
Title:
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Mainstem Dams
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
26934 REL 36
Contract Title:
1999-003-01 EXP PNNL CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Contract Continuation:
Previous: Next:
26934 REL 32: 1999-03-01 EXP PNNL CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
  • 56065 REL 5: 1999-003-01 EXP PNNL CHUM SALMON SPAWNING BELOW 4 LOWER DAMS
Contract Status:
Closed
Contract Description:
During FY 2012 PNNL will continue to operate and maintain a real-time temperature and water surface elevation data collection system in chum salmon spawning habitat within the Ives Island area.   PNNL will provide the data hourly via cellular telemetry to the fish passage center.  The primary purpose of the monitoring effort is to provide BPA and the Fish Passage Center with data that can be used to evaluate chum salmon emergence timing and redd dewatering.  The data will be compiled in an annual report and provided to BPA electronically.  The annual report will provide BPA with an electronic appendix of temperature and water surface elevation data, and will include a brief summary of mean temperature differences between the river and riverbed during both the chum salmon spawning and the chum salmon incubation time periods.
Account Type(s):
Expense
Contract Start Date:
10/01/2011
Contract End Date:
09/30/2012
Current Contract Value:
$57,543
Expenditures:
$57,543

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Evan Arntzen Pacific Northwest National Laboratory Yes Contract Manager evan.arntzen@pnnl.gov (509) 371-7201
Terrie Bear Pacific Northwest National Laboratory Yes Administrative Contact terrie.bear@pnl.gov (509) 372-2623
David Geist Pacific Northwest National Laboratory No Supervisor david.geist@pnnl.gov (509) 371-7165
Kevin Ghirardo Pacific Northwest National Laboratory Yes Administrative Contact kevin.ghirardo@pnl.gov (509) 371-7198
Julie Hughes Pacific Northwest National Laboratory Yes Administrative Contact julie.hughes@pnl.gov (509) 371-7202
Patrick Hulett Washington Department of Fish and Wildlife (WDFW) No Interested Party patrick.hulett@dfw.wa.gov (360) 577-0197
Kathy Lavender Pacific Northwest National Laboratory No Administrative Contact kathy.lavender@pnnl.gov (509) 376-1724
Genice Madera Pacific Northwest National Laboratory No Administrative Contact genice.madera@pnso.science.doe.gov (509) 372-4010
Rosemary Mazaika Bonneville Power Administration Yes F&W Approver rxmazaika@bpa.gov (503) 230-5869
Marlene Meeks Pacific Northwest National Laboratory No Administrative Contact marlene.meeks@pnl.gov (509) 372-6258
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Christine Petersen Bonneville Power Administration Yes COR chpetersen@bpa.gov (503) 230-4695
Ron Roler Washington Department of Fish and Wildlife (WDFW) No Interested Party rolerrjr@dfw.wa.gov (360) 906-6737
Janie Vickerman Pacific Northwest National Laboratory Yes Administrative Contact janie.vickerman@pnnl.gov (509) 371-7260
Nancy Weintraub Bonneville Power Administration No Env. Compliance Lead nhweintraub@bpa.gov (503) 230-5373


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance B: 165. Environmental Compliance 10/01/2011 10/01/2011
Temperature and water surface elevation data C: 157. Collect temperature and water surface elevation data in chum spawning areas 09/30/2012 09/24/2012
Attach Progress Report in Pisces D: 132. Submit Progress Report for the period Oct 2010 to Sep 2011 01/28/2012 02/03/2012
Funding Package - Submit draft to COTR E: 119. Manage and Administer Project 07/01/2012 09/24/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2011
B 165 Environmental Compliance 10/01/2011
C 157 Collect temperature and water surface elevation data in chum spawning areas 10/01/2011
D 132 Submit Progress Report for the period Oct 2010 to Sep 2011 10/01/2011
E 119 Manage and Administer Project 10/01/2011